CLIENT:City of Cape Town
CONSULTING ENGINEER: Entech

- Removal for refurbishment of the 3.5 ton tidal pool valve.
- Depth: shallow diving in the tidal zone.
- Involved excavation in loose gravel to expose and remove the bolts,
while in the impact zone, further the construction of a temporary access
road was necessary to enable the lifting of the valve.
- After 8 months, when replacement valves were ready, further
excavation was required.
- The original valve was replaced with 3 smaller valves, which require
ongoing maintenance.
|
|
|
|
|
|
|