Gordons Bay
- Harbour Island Jettys
-----
CLIENT Harbour Island
CONSULTING ENGINEER Entech
SCOPE OF WORK
- Remove existing moorings and replace with 300m of floating jettys.
- Jettys are of galvanized steel construction, clad in hardwood timber.
- Entire mechanism accomadates tidal range by sliding on 10 columns, 400mm
diameter, each fixed to its own 20m3 reinforced concrete base placed at
-6m below mean sea level.
- Concrete was pumped over 100m from the shore into the shutter seen below.